Partial Contracts /
Client List:
Australia
|
 |
BHP - Port Hedland, Western Australia.
PACE Project - Nelson Point and Finucane Island.BHP
Billiton Iron Ore has six mining operations in the Pilbara - Mt Whaleback
and nearby Satellite Ore bodies 23, 25, 29 and 30, Jimblebar, Yandi, Area C
and Yarrie. Altogether, the mines currently produce around 80 million wet
tonnes of iron ore.
Processing and shipping facilities are located at Nelson Point and Finucane
Island, Port Hedland. |
Supervision:
- Quality Control on Steelcord splicing for the Belt
manufacturer and end user .
- Supervision of Conveyor Belt Installation.
|
|
 |
Henry Walker Eltin - Yandicoogina, Western Australia.
Henry Walker Eltin has completed the design and construction
of an additional crushing plant at the Yandi iron ore mine in the Pilbara
region of Western Australia.
The new crushing facility, (to be known as the Interim Crushing Plant) was
designed and constructed by Henry Walker Eltin to add capacity to produce
5.5mt of Yandi fines per annum.
|
Supervision:
- Quality Control on Steelcord splicing for the Belt
manufacturer and end user .
- Supervision of Conveyor Belt Installation.
|
|
 |
Hamersley Iron - Yandicoogina, Western Australia.
Yandicoogina was commissioned in late 1998 and produces a separate iron ore
product known as Yandi (HIY) fines. The mine, located about 90km north-west
of Newman, is a single open pit mine with dry crushing and screening.
The Yandicoogina 36 million tonnes per annum mine expansion is expected to
be commissioned in early 2005. |
Supervision:
- Quality Control for Steelcord splicing for the Belt
manufacturer / End user .
- Supervision of Conveyor Belt Installation.
|
 |
Hamersley Iron - Eastern Range, Western Australia.
The Eastern Range deposit, 10km east of the Paraburdoo mine,
will replace current Paraburdoo mining pits as they run out in 2004. The ore
will be mined by the BaoHI Ranges Joint Venture. Hamersley will hold a 54%
equity share in the joint venture and the remaining 46% will be held by
China’s largest steel maker Shanghai Baosteel Group Corporation. |
Supervision:
- Quality Control for Steelcord splicing for the Belt
manufacturer / End user .
|
|
 |
Granny Smith - Western Australia.
Granny Smith deposit, which consisted of three discontinuous
zones (Granny, Goanna and Windich), was mined out in 1995. Five satellite
deposits (including Keringal, Jubilee and Sunrise) have also been depleted.
Ore is currently supplied entirely from the Wallaby deposit. Development of
the Wallaby deposit began in October 2000 and ore production commenced in
October 2001. Production by the Granny Smith Mine is subject to a 2.5% GSR
royalty payable to the State Government of Western Australia. |
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
 |
Worsley Alumina Refinery - Western Australia.
Construction of a mine site and refinery began in 1980 and the first alumina
was produced in April 1984.
In May 2000, Worsley completed an $850 million expansion and annual
production has increased to 3.1 million tonnes. |
Installation:
- OEM Conveyor Belt installation & Splicing.
|
|
 |
Boddington Mine - Western Australia.
Boddington mine site is 123 kilometres south-east of Perth,
in Western Australia, and is the nearest town to the Worsley Alumina bauxite
mine. |
Installation:
- OEM Conveyor Belt installation & Splicing.
|
 |
Leinster Nickel Operations - Western Australia.
Leinster Nickel Operations are located 370 klms north
of Kalgoorlie in Western Australia.
|
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
|
 |
St Ives Gold Mine - Western Australia.
St Ives is located on the highly prospective Norseman-Wiluna
belt and the concentrated drill programme within the concession area
continues to return encouraging results from both Mineral Resource infill
drilling and early stage drilling on targets still advancing to a reportable
Mineral Resource status. |
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
 |
Fimiston Plant [ KCGM ]- Kalgoorlie, Western Australia.
KCGM’s operation is at the south-east corner of the city of
Kalgoorlie-Boulder, which is about 600kms east of Perth, capital city of
Western Australia.
KCGM produces up to 850,000 ounces of gold every year and its operation far
outweighs any other mining centre in Australia.
The Super Pit is the biggest gold open pit mine in the country. |
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
|
 |
Hilton Mine - Mount Isa, Queensland Australia.
GEORGE FISHER LEAD, ZINC AND SILVER MINE, QUEENSLAND,
AUSTRALIA
Lead-zinc-silver deposit 20km north of Mount Isa, named Hilton after the
then Mount Isa mine manager. In 1981, similar mineralisation was located 2km
further north. MIM first decided to develop Hilton in 1969 but market
factors delayed start-up of the 1Mt/y mine and concentrator until 1990.
|
Supervision:
- Steelcord splicing.
- Supervision of Conveyor Belt Installation.
|
 |
Mt Todd - Northern Territory, Australia.
The Mt Todd mine commenced operations in January 1997. |
Installation:
- OEM Conveyor Belt installation & Splicing.
|
|
 |
Sugar Milling - Queensland, Australia.
Queensland has some of the most efficient and technologically
advanced sugar mills in the world. Innovative machinery and mill technology
developed by Queensland manufacturing companies has been exported to other
sugar producing countries.
26 mills crush sugar cane during the annual crushing season, between June
and December.
|
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
 |
Hay Point – Mackay , Queensland, Australia.
Situated about 40 kilometres south of Mackay in Sarina Shire, the Port of
Hay Point is one of the largest coal export ports in the world.
Hay Point Services Coal Terminal, owned and operated by BHP Billiton
Mitsubishi Alliance (BMA).
Hay Point Coal Terminal has a throughput capacity of approximately 34 mtpa.
|
Supervision:
- Quality Control for Steelcord splicing for the Belt
manufacturer / End user .
|
|
 |
Dalrymple Bay Coal Terminal – Mackay , Queensland,
Australia. DBCT has a throughput capacity of
approximately 54 million tonnes per annum (mtpa). Mines supplying DBCT are
Blair Athol, Goonyella - Riverside, German Creek, Oaky Creek, North
Goonyella, Burton, Moranbah North, Foxleigh and Coppabella. Mines supplying
Hay Point Services are Goonyella - Riverside, Peak Downs, Saraji, Gregory,
Norwich Park and South Walker.
|
Supervision:
- Quality Control for Steelcord splicing for the Belt
manufacturer / End user .
|
 |
Central Queensland Port Authority [ CQPA ]
Gladstone Port Authority [ GPA ]
– Gladstone , Queensland, Australia.The Port of
Gladstone is one of the world's top five coal export ports, handling in
excess of 38 million tonnes of coal per annum. Coal is the port's largest
trade, representing over 70% of the total cargo exported through the port.
Central Queensland Ports Authority owns and operates two coal export
terminals in the Port - R G Tanna Coal Terminal and Barney Point Terminal.
Combined, these two terminals have the capacity to handle over 45 million
tonnes per annum (Mtpa). |
Supervision:
- Quality Control for Steelcord splicing for the Belt
manufacturer / End user .
|
|
 |
Cape Flattery - Queensland, Australia.
Cape Flattery Silica Mines is a wholly owned subsidiary of
Mitsubishi Corporation.
Founded in 1967, the mine was purchased by Mitsubishi in 1977 and in 1987 a
deep water jetty was brought into operation. Cape Flattery Silica Mines
employs over 100 people of which 50% are of Aboriginal descent.
Cape Flattery Silica Mines is the largest global exporter of silica sand and
has the highest production of silica sand for any mine in the world.
|
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
 |
North Parkes Mine - New South Wales, Australia.
The North Parkes copper-gold mine is located at Goonumbia, 27
km north/north-west of the central New South Wales township of Parkes and is
a joint venture with the Sumitomo Group (20 per cent). Mining commenced at
North Parkes in 1994, initially as an open cut operation. Underground block
caving mining has bee undertaken since 1997. |
Supervision:
- System Audits
- Maintenance
- Shutdowns
- Installations
- Change outs
- Splicing
- Rubber lining
|
|
|
Africa |
|


|
|
Installation:
- OEM Conveyor Belt installation & Splicing.
- Training of National personnel.
|
|
|
India -
Bangladesh |
|



 |
Press release : Phoenix Conveyor Belt Systems
Hamburg, April 30, 2004
New world record for Phoenix Conveyor Belt Systems Phoenix
supplies the
longest conveyor belt on earth for the
transport of crushed limestone from India to Bangladesh.
PHOENIX Conveyor Belt Systems GmbH of Hamburg, Germany and PHOENIX
Yule Limited of Kalyani, India have been awarded a multi million dollar
contract for the supply of 35 km of Phoenocord
steel cord conveyor belts for the Lafarge Surma Project in
India/Bangladesh.
It is a single flight operation without booster drives incorporating the
longest conveyor belt on earth. This extremely long conveyor belt, type 800
/ St 2500 - 6/6 X, will carry up to 960 tons of crushed limestone per hour
from the mine site in Meghalaya/India to the cement
plant in Chattak/Bangladesh. The cement plant will produce 1,2
million t/a.
The 17 km conveyor track runs for about 7 km across
hilly terrain, to the international border of India, and then another 10 km
in the farthest northern part of Bangladesh. The belt runs
elevated at a height of between 5 to 15 m. The conveyor belts will be
shipped on 89 reels, which are up to 4,4
m long and 3,4 m high, containing up to 500
m of conveyor belt each.
The conveyor belts will be spliced at two stations, one each in India and
Bangladesh, under the supervision of Phoenix engineers later this year. |
Project Manager:
- Steelcord splicing.
- Conveyor Belt Installation.

 |
|
|
China |
|

 |
Underground Coal Mine - Drift / Slope conveyor
installation of approx 3 klms x 1600 mm x ST 5000. |
Supervision:
|
|
|
|
Papua New Guinea
|
|

 |
Porgera Mine - Papua New Guinea.
The Porgera mine, located in the Enga Province in the
highlands of Papua New Guinea, is often considered one of the world’s great
gold mining operations.
In 2004, Porgera was the largest contributor to Placer Dome’s gold
production and it is estimated that it will add another 720,000 ounces of
gold in 2005. |
Supervision:
-
Conveyor systems installations and maintenance.
-
Conveyor belt installation and maintenance.
-
Training of nationals and expatriate personnel.
-
Conveyor splicing and repairs.
-
Belt cleaner maintenance.
-
Idler and roller maintenance.
-
General servicing conveyor systems.
|
|
 |
Misima Mine - Papua New Guinea. The
Misima mine is located on the eastern half of Misima Island, Milne Bay
Province, Papua New Guinea (PNG).
Misima Island is approximately 200 kilometres east of the PNG mainland.
|
Supervision:
-
Conveyor systems installations and maintenance.
-
Conveyor belt installation and maintenance.
-
Training of nationals and expatriate personnel.
-
Conveyor splicing and repairs.
-
Belt cleaner maintenance.
-
Idler and roller maintenance.
-
General servicing conveyor systems.
|
|
|
|
|
FIJI |
|
 |
Fiji Industries - Fiji. The plant
was commissioned in 1962 with a wet process No.1 kiln which had a production
capacity of 150 tonnes of clinker per day. Later in 1969, a No.2 kiln with
270 tonnes of clinker per day was installed in place of the first one.
During 1974, as a result of rising oil prices around the globe, coal was
used instead of oil as an igniter and coal grinding was carried out using a
ball mill. |
Supervision:
-
Conveyor systems installations and maintenance.
-
Conveyor belt installation and maintenance.
-
Training of national personnel.
-
Conveyor splicing and repairs.
-
Belt cleaner maintenance.
-
Idler and roller maintenance.
-
General servicing conveyor systems.
|
|
|
|
Hong Kong |
|

 |
High Angle Conveyor was used for the subway
tunnelling project in Hong Kong. |
Supervision:
-
Conveyor belt installation and maintenance.
-
Training of national personnel.
-
Conveyor splicing and repairs.
-
General servicing conveyor systems.
|
|
|
|
Indonesia |
|

 |
PT Freeport - Indonesia. PT
Freeport Indonesia's operations in Papua, Indonesia, involve mineral
exploration and development, mining and milling of ore containing copper,
gold and silver and the worldwide marketing of concentrates containing those
metals. PT Freeport Indonesia is also a 25 percent owner of PT Smelting,
which operates a copper smelter and refinery in Gresik, Indonesia. |
Supervision:
- Quality Control on Steelcord splicing for the Belt
manufacturer / End user .
|
|
|
|
Puerto Rico |
|
|
|
Installation:
- OEM Conveyor Belt installation & Splicing.
|
|
|
|
United States of America |
|



 |
Belt Maintenance Group Since
1970 Belt Maintenance Group has offered the quickest, most qualified
conveyor belt maintenance service in the industry,
Over the years we've expanded from one shop in Buffalo, NY to multiple
locations.
By doing this, we have become one of the largest companies in terms of
both equipment and manpower for conveyor product sales, installation and
repair work. |
Supervision:
-
Major Projects
-
OEM Conveyor Belt installation & Splicing.
-
Conveyor systems installations and maintenance.
-
Conveyor belt installation and maintenance.
-
Conveyor splicing and repairs.
-
Belt cleaner maintenance.
-
Idler and roller maintenance.
-
General servicing conveyor systems.
|
|
|
|
Saudi Arabia |
|


 |
Saudi Arabia Single length
replacement of 2 overland systems.
1 x 8 kilometres and 1 x 4 kilometres – approx.
ST1250 x 1000 mm Wide. |
Project Manager:
- Steelcord splicing.
- Conveyor Belt Installation.
|
|